Valencia Road, Alvernon to Wilmot Project

PROJECT LIMITS: The project limits are Valencia Road, between Alvernon Way and Wilmot Road.

SCOPE OF WORK: The proposed project consists of widening Valencia Road from Alvernon Way to Wilmot Road in order to improve safety, reduce congestion, improve operations and increase mobility. Specifically, the project will widen the existing roadway from four lanes to six lanes including widening the bridge structure over the Union Pacific Railroad. Some of the potential improvements to be considered and evaluated include a depressed landscaped median, multi-use lanes, provisions for pedestrians and other uses and landscaped shoulders.

This is Regional Transportation Project (RTA) #24

 

PDF Reports

Final Draft Environmental Assessment and Mitigation Report • September, 2011

Geotechnical Report • June 12, 2011

Design Concept Report • May 17, 2011

Draft Preliminary Site Assessment • March, 2011

Draft Drainage Report • May 3, 2011

Final Traffic Report • July 7, 2011

Full Environmental Screening Report • May 9, 2011

Design Plans, Stage 1 • July 12, 2011

Valencia Noise Report, Final • July 12, 2011

Valencia Biological Evaluation, Final • July 7, 2011

Valencia Visual Resource Report • June 23, 2011

 

 


Pima County Department of Transportation

Carol Brichta
Carol.Brichta@dot.pima.gov

Phone: (520) 740-6410

201 N. Stone Ave., 4th Floor
Tucson, AZ 85701

 


county seal back to pima.gov

Copyright © 2010, All rights reserved

 
Privacy Statement / Disclaimer