|
![]() |
General Information
|
Valencia Road, Alvernon to Wilmot ProjectPROJECT LIMITS: The project limits are Valencia Road, between Alvernon Way and Wilmot Road. SCOPE OF WORK: The proposed project consists of widening Valencia Road from Alvernon Way to Wilmot Road in order to improve safety, reduce congestion, improve operations and increase mobility. Specifically, the project will widen the existing roadway from four lanes to six lanes including widening the bridge structure over the Union Pacific Railroad. Some of the potential improvements to be considered and evaluated include a depressed landscaped median, multi-use lanes, provisions for pedestrians and other uses and landscaped shoulders. This is Regional Transportation Project (RTA) #24 PDF ReportsFinal Draft Environmental Assessment and Mitigation Report • September, 2011 Geotechnical Report • June 12, 2011 Design Concept Report • May 17, 2011 Draft Preliminary Site Assessment • March, 2011 Draft Drainage Report • May 3, 2011 Final Traffic Report • July 7, 2011 Full Environmental Screening Report • May 9, 2011 Design Plans, Stage 1 • July 12, 2011 Valencia Noise Report, Final • July 12, 2011 Valencia Biological Evaluation, Final • July 7, 2011 Valencia Visual Resource Report • June 23, 2011
Pima County Department of Transportation Carol Brichta Phone: (520) 740-6410 201 N. Stone Ave., 4th Floor
|
Copyright © 2010, All rights reserved |
||
| Privacy Statement / Disclaimer |