River Bend Roadway Improvements |
![]() |
|
River Bend
|
River Bend Roadway Improvements Design ProjectsDOT 4 - River Road from Campbell Avenue to Alvernon WayThe project will widen
and realign River Road from east of Campbell Avenue to the extension
of Alvernon Way, east
of Dodge Boulevard. The roadway in this segment will
consist of two through lanes in each direction and a left turning lane, with
a paved
shoulders, storm
drains, and landscaping. The project will include drainage
improvements for the Camino Real and Finger Rock Washes, as well as other smaller
drainages
that currently cross River Road. Improvements to Camino
Real Wash will include
increased channel capacity north of River Road, construction
of a box culvert under River Road, and construction of a new
outfall channel to the Rillito
River. DOT 5 - Alvernon Way from River Road to Fort Lowell RoadThe
project will extend
Alvernon Way from its
existing intersection
of Ft. Lowell Road, north and west
across the Rillito River to connect to
River Road in the vicinity of Dodge Boulevard.
From Ft.
Lowell to the Rillito
River, the cross-section will be two lanes in each direction, with a
left turning lane.
From River Road to south
of the
Rillito River, the
roadway will be a four-lane
cross-section
with a raised median. The new road will include paved
shoulders, curbs, storm drains,
landscaping,
and pedestrian
facilities. The project
includes a new bridge across the Rillito
River, complete with sidewalks
and paved shoulders. |