La Cholla Boulevard - Magee Road to Overton Road
Road Improvement Project:

 

truck girder thumb crane lifting thum girder placement bridge girder thumb
Construction images from project site, May, 2013
Click for larger image

constrution trucks la cholla north construction of soil cement structures garfield wing wall construction
Construction images from project site, March, 2013
Click for larger image

retaining wall footing retaining wall footing installed drilling drilling shafts for bridge support retaining wall texture retaining wall aesthetic texture cage being lowered into shaft support cage being lowered into shaft
Construction images from project site, December, 2012
Click for larger image

soil cement thumb wall construction
Construction images from project site, October 15, 2012
Click for larger image

plant salvage thumbnail

Native plant salvage from project site, September 11, 2011


Click here for meeting notice and map (151k pdf)

Project Information

Construction Detour Alert, October 15-24, 2012


An RTA Project by Pima County Department of Transportation

NOTICE: This web site will be updated during the design and construction phases of this project. Please check here for the latest news, background information and announcements of meetings or public events.

la cholla north january flood fotos
Click above photos to see larger versions. Photos taken on La Cholla at the Cañada del Oro wash, January 2010

Dear La Cholla Neighbors,

With great anticipation, the County embarks upon another major roadway improvement project, La Cholla Boulevard from the north leg of Magee Road to Overton Road. This is one of the projects sponsored by the County and the RTA with a major concern being the flooding from the Cañada Del Oro Wash in times of rain.

Planned improvements include widening La Cholla Boulevard to a four lane divided roadway with a center median, paved shoulders, a bridge over the Canyon del Oro Wash, pedestrian way, and landscaped medians. In addition to increasing traffic capacity, safety will be enhanced in a number of ways.

Safety features include:
· Improved sight distances
· Improved drainage
· Improved intersection geometry
· Pedestrians ways
· Median curbs for access control

The Pima County Department of Transportation (PCDOT) design team will begin with a corridor study from Magee Road to Tangerine Road, followed by an Environmental Report from Magee Road to Lambert Lane. Phase 1 construction on La Cholla Boulevard will extend from Magee Road to Overton Road. The design team will develop design plans for the project with input from a local Community Advisory Committee (CAC). PCDOT and our team of design professionals are committed to designing and constructing safe, functional, and
environmentally sensitive roads that enhance life in the community.

Sincerely,

PIMA COUNTY DEPARTMENT OF TRANSPORTATION
Dean Papajohn, P.E.
Project Manager

Some documents in this Web site are formatted as Adobe Acrobat PDF. Proper viewing in PDF files requires installation of the Adobe Acrobat Reader and plug in for your browser.

get acrobat


county seal back to pima.gov

Copyright © 2007, All rights reserved

 
Privacy Statement / Disclaimer